|  | Example Projects- Plastic parts in as little as 2-4 weeks
- Complex Tooling: Slides; Lifters; Undercuts; Core Pulls and More!
- All engineering grade materials available
- Quality tooling with no compromise
|
Example Projects by Metro Plastics
 |  | SHORT RUN PRODUCTION TOOL EXAMPLE PROJECT Goal - 1 cavity prototype tool
- Sharp corners
- Hold tolerances of +/- 0.001
- 10 day lead time
- Material: Delrin
- Build prototype mold to sustain production need for 1 year (50,000 shots).
|
Solution
- 1 cavity steel mold
- Samples provided in 4 days
- Mold has ran 60,000+ pieces to date
- Mold transferred to Metro for production needs. Transit time - 2 weeks.
 |  | PARTS ONLY EXAMPLE PROJECT Goal - 1 cavity rapid prototype tool
- Utilize slides
- Sharp corners
- 15 day lead time
- Material: polycarbonate
- Build rapid injection mold for part design verification... 200 parts only
|
Solution
- 1 cavity steel mold
- All 200 parts provided in 12 days
- Additional 200 parts after engineering - change provided in 3 days.
- Mold remained at tool source. Customer went on to build 12 cavity production mold with Metro with no required changes.
 |  | PRODUCTION MOLD EXAMPLE PROJECT Goal - 1 cavity rapid prototype tool
- Complex Geometry
- Sharp corners
- 4 week lead time
- Utilize Metro Tooling Standard
- Material: glass filled Nylon
- Build production tool and submit samples to customer for approval
- Ship mold to customer for production.
|
Solution
- 1 cavity steel mold
- 20 Samples provided in 3½ weeks
- Samples approved by customer
- Mold shipped to customer... transit time 2½ weeks.
 |  | PROTOTYPE MOLD/BRIDGE TOOL EXAMPLE PROJECT Goal - 1 cavity prototype tool
- Deep interior pocket
- Utilize both LIFTERS and SLIDES
- 4 week lead time
- Material: Glass filled PC V-0
- Build mold and run 1,000 pcs at tool source then ship to Metro Plastics for future orders.
|
Solution
- 1 cavity steel mold (H13 mold inserts)
- 12 samples provided in 4 weeks.
- samples after EC - 3 days.
- Mold has ran 20,000 pcs to date
 |  | INSERT MOLDING EXAMPLE PROJECT Goal - 1 cavity bridge tool
- Heat staked threaded insert
- Inserts provided by customer
- 2 week lead time
- Material: ABS V-0 material
- Build mold and run 2,000 pcs at tool source
- Tool to remain at tool source
|
Solution
- Insert molded threaded insert
- samples provided in 9 days
- samples after EC - 2 days
- Mold ran 9,500 pcs while 6 cavity production mold being built.
Additional Images of Our Projects